|
Quantity
|
Total
|
||
|
|
|||
|
|
|||
The TAWI MHL40 moves cartons from trucks or containers to pallets or conveyors. The unit can be moved between warehouse work areas and requires an external power supply at the point of use.
| Parameter | Value |
|---|---|
| Lifting capacity | Up to 40 kg for airtight loads |
| Lifting speed | 0–1 m/s |
| Arm | Carbon fibre or steel |
| Unit weight | 695 kg |
Send the load weight, dimensions and a photo of its surface to select a suction attachment. For loads above 40 kg, ask whether the MHL50 is suitable.
Configuration and technical details
Country of origin: France
EQUIPMENT
- Product model: MHL40
- Maximum load: 40 kg for airtight loads
- Arm type: Carbon arm / Steel arm
- Total weight: 695 kg
- Noise level: 55 dBA
- Power: 2.2 kW / 2.6 kW
- Frequency: 50 Hz / 60 Hz
- Voltage (3 phase N + PE): 230 V / 400 V
- Lifting speed: 0-1 m / s
This product is the mobile version of our very popular high frequency lift. Our fast lift instantly grabs and lifts boxes and other packaged goods. With a convenient handle for one-handed use, it is possible to lift and move goods at a very high frequency. Ideal for logistics centers and other operations where speed is important. The mobile version has an adjustable rack parking, thanks to which the device takes up a small area when not in use and is easy to move.
The MHL40 mobile high frequency lifter from TAWI is the solution when you need to handle goods quickly and efficiently while maintaining full mobility in your facility. It is a versatile lifting solution specifically designed for container loading and unloading.
To use this solution, you will need an external power source close to where you want to use it. It does not require any unique installations or equipment.
Easy to use during the logistics process from container and truck unloading, order picking or conveyor to pallet.
The ability to move the equipment to other warehouse areas means that the equipment becomes a multifunctional asset for the operation. In 3PL areas, the mobile high frequency lift can be divided into several contracts, reducing the amount of labor involved, as this equipment can reduce the number of workers.
Delivery time from the manufacturer's factory: 8-12 weeks. The exact delivery date will be communicated after the order is placed on the website.